top of page
Construction worker measuring pipes on a wall while holding blueprints in a partially built room.

Pipe chasing in Westbury ready for follow-on trades

Wall and floor routes cut. Pipe insulation allowed for. Straight runs prepared to agreed sizes.

Reduce delays between chasing and plumbing

Space for insulation

We size the chase around the full pipe build-up, not just the bare tube.

Straight runs for fitting

Accurate routes help clips and pipes follow the planned line more easily.

Prompt trade handover

Completed channels can be left ready for immediate follow-on installation.

Recessed routes that fit the full pipe build-up

A chase sized only for bare pipe leaves no room for insulation, clips or the final finish. We form channels in walls and suitable floors for plumbing and recessed heating runs, using dimensions agreed for the complete installation. Straight, accurately positioned routes help the plumber fit and secure pipework without spending time correcting a wandering groove. We can plan around connection points, changes in direction and the intended depth below the finished surface, giving the next trade a practical route rather than an approximate trench.

Plumbing pipes installed in a partially renovated room with construction tools on the floor.
Construction worker measuring pipes on a wall while holding blueprints in a partially built room.

Prepared so installation can follow promptly

Before cutting, we need the pipe diameter, insulation thickness, fixing method and intended surface finish. Bends, expansion requirements and connections all affect the route, while existing concealed services must be considered before blades enter the wall or floor. We use professional chasing equipment with extraction to control much of the dust at source. Once completed, the agreed workspace can be left ready for the plumber to begin the follow-on installation without waiting for further channel preparation.

Frequently asked questions

How deep should a plumbing pipe chase be?

Depth depends on the pipe, insulation, clips and final wall or floor finish. The route must also suit the construction. We work from the plumber's required dimensions rather than applying one depth to every job.

Can you chase floors for heating pipes?

We can assess suitable wall or floor channels for recessed heating and plumbing runs. Floor construction, services, required depth and the final finish must be checked before we confirm the equipment and route.

Can the plumber start as soon as chasing is complete?

Yes, the agreed area can be left ready for prompt follow-on work. The plumber remains responsible for fitting, securing and testing the pipework, while later making good follows once the installation stage is complete.

Construction worker measuring pipes on a wall while holding blueprints in a partially built room.

Prepare the route before the plumber arrives

Complete our form with pipe sizes, insulation, route dimensions, wall or floor type and connection points.

Contact us

S&N Diamond Drilling Ltd

33 Oldfield Park, Westbury BA13 3LQ, UK

Business hours

Monday - Friday: 08:00 - 17:00 -
We also offer groundwork services - spgroundworkswestbury.co.uk

Find Us on Yell

S & N DIAMOND DRILLING LIMITED, registered as a limited company in England and Wales under company number: 16680985. Registered Company Address: 33 Oldfield Park, Westbury, England, BA13 3LQ.

Terms of Use | Privacy & Cookie Policy | Trading Terms

© 2026. The content on this website is owned by us and our licensors. Do not copy any content (including images) without our consent.

bottom of page